Scotsman SCE275 Bedienungsanleitung Seite 12

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 36
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 11
SCE275
August 2000
Page 12
Initial Start Up
1. Remove two screws and the left grill (G series
and higher).
2. Locate the AutoIQ Controller - use a flashlight to
see the buttons and lights.
3. Plug the machine in or switch on the electrical
power. Note that the controller’s indicator lights all
flash on briefly when power is connected.
4. Open the water supply valve to the machine.
5. Push and release the Freeze cycle push button
(the Freeze indicator light will blink until the
compressor starts). The next several operations
are automatic.
Initial Start (30 seconds)
The Freeze light begins to blink.
The Hot Gas Solenoid valve will be open.
The inlet water valve opens to fill the reservoir
and shuts off when the reservoir is full. Note: If
the reservoir does not fill the next steps do not
happen.
The water pump starts. Note: if the pump does
not start the next steps do not happen.
The inlet water valve opens again to refill the
reservoir.
After 30 seconds, the hot gas valve closes and
the compressor starts.
Freeze Cycle:
The Freeze indicator light will come on. The
machine will stay in a Freeze cycle for many
minutes. Slush may appear in the reservoir, it is
temporary and normal.
Under certain conditions, the pump may stop for
a few seconds. After that the inlet water valve
will refill the reservoir.
The fan motors (of air cooled models) will begin
to turn and soon warm air will be forced out the
front of the cabinet. After 4 minutes the fan
motors may cycle on and off every 30 seconds
in cooler ambients.
As the freeze cycle progresses, the water level
will fall and the inlet water valve will open to refill
the reservoir. This will happen twice every cycle.
The freeze cycle will continue until the water
level in the reservoir has fallen again to its
factory set point, then the AutoIQ Controller may
switch the air cooled fans off. After a short time,
the Harvest Cycle will begin.
Harvest Cycle:
The Harvest indicator light will be ON,
The hot gas valve will open.
The water pump will stop. It will restart in less
than a minute.
The Inlet water valve will open. The machine will
fill the reservoir and overflow it for a specified
number of seconds then shut off. The harvest
cycle may still be in progress.
The Bin Full indicator light will go on and off as
ice falls from the evaporators.
6. Machines are shipped from the factory with the
purge level set to accommodate average water
conditions. To achieve optimal machine
performance, set the purge level to the minimum
setting.
Note: While the amount of water purge is
adjustable, only those installations with a water
supply known to be excellent (very low TDS or total
dissolved solids) should adjust to the minimum
setting. See page 14 for purge adjustment
instructions.
7. Observe ice harvest. Check that the ice slides
easily into the bin, and does not hang up on any
mis-positioned part.
8. After about 5 minutes the machine will return to
a freeze cycle.
Note: The first 1-2 harvest cycles will be very
long to establish a typical harvest time.
9. Fill out the Customer Evaluation and Warranty
Registration. Send it to Scotsman.
10. Replace the front grill.
11. Inform the user of the location and telephone
number of the local service company. Also inform
the user of the required maintenance of the
machine.
Seitenansicht 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 35 36

Kommentare zu diesen Handbüchern

Keine Kommentare