17 Open nitrogen bottle and braze compressor suction, discharge and process joints
together. Braze new drier into system.
18 Shut off nitrogen, shut access valves.
19 Evacuate to at least 300 microns.
20 Replace PTCR and run capacitor.
21 Weigh in the nameplate charge. Check for leaks.
22 Reconnect electrical leads.
23 Attach compressor terminal cover.
24 Reconnect electrical power.
25 Return sound shield and front panel to their original positions.
Note: If the compressor is being returned for warranty, braze the stubs shut and tag the compressor with
the required information.