
MC 15 + MC 45
MC 15 + MC 45
STACKING INSTALLATION
STACKING INSTALLATION
The Interface PC
Board must be
installed in the bottom
machine. The Optical
Ice Level Control
must be connected to
its inlet and, the two
Main PC Boards of
bottom and upper
machine to the outlets,
in order to switch off
both machines as soon
as the ice is stored
between the two eyes
of the optical ice level
control.
Kommentare zu diesen Handbüchern